
New TopShim run:

version = topshim 2.0.0
date = 2025-09-25
time = 17:08:51.938
command = topshim 

FINE SHIMMING

Parameters:

probe = Z114607_0227
solvent = D2O
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 4.70 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.8 Hz, Target= 0.2 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration  3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.2 Hz
Iteration  4: FWHM Before= 0.2 Hz, Target= 0.4 Hz, After= 0.6 Hz
Iteration  5: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 0.6 Hz
Iteration  6: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 0.8 Hz
Iteration  7: FWHM Before= 0.8 Hz, Target= 0.4 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.919

shim changes: 
Z	-1012
Z2	-457
Z3	-678
Z4	-4045
Z5	-7360
Z6	-10185

duration = 1 min 54 sec
completed successfully
finished Thu Sep 25 17:10:44 2025


========================================================================
